MEGA METAL PROJECT
Mert Software & Electronics > MEGA METAL PROJECT

MEGA METAL PROJECT

Beside the production of High Quality Products, the continuous customer satisfaction principle and investments to the strategic areas, has made Mega Metal also one of the World Class Electrolytic Copper suppliers and export 60 % of the production to a wide customer portfolio from U.S.A. to China.

Mega Metal is proud of advancing the quality of products by High Technology Equipments and Highly Qualified Staff. Mega Metal is aware about the importance of the Quality and Service and focused on understanding the needs of the customers.

Mega Metal is holding ISO 9001:2008 Quality Management Certificate. Through Total Quality Management (TQM), quality management efficiency has been improved to post sales services.

The production process in Mega Metal starts with pouring “A” quality cathode copper in Upcast machine in 8,0 mm in diameter as oxygen-free electrolytic copper stem. Electrolytic copper stem in 8,0 mm diameter is reduced as undressed or blanched mono or multi stemed and put up for sale in direction with customer requests or sent to bending unit for later production stages and put up for sales as bended.

The plant has around 70.000 m2 open space and 22.000 m2 interior. Production is executed over 120 machines and aims to online monitor every stage of the production with TREX DCAS MES. The system will have been integrated with ERP until the end of 2014 and actual operation durations will be recorded in ERP via TREX DCAS. Thus the data will be prepared for cost accounting in ERP.

PROJECT DETAILS

COMPANY:
MEGA METAL
LOCATION:
Meclisi Mebusan Cad. Fındıklı Han No:63 Kat:2 Avrupa, Beyoğlu/İstanbul
PROJECT START:
12.07.2012
PROJECT COMPLETION:
25.12.2012
CATEGORY:
TrexDCAS